Item F1992:05/017.02 - Operation update : energy blueprint for the eighties : [short version]

Title and statement of responsibility area

Title proper

Operation update : energy blueprint for the eighties : [short version]

General material designation

  • moving images

Parallel title

Other title information

Title statements of responsibility

British Columbia Hydro and Power Authority

Title notes

  • Variations in title: Blueprint for the eighties

Level of description

Item

Reference code

F1992:05/017.02

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • 1981 (Creation)

Physical description area

Physical description

1 film reel (00:27:00 ; 972 ft) : release print no. 2, colour, sound ; 16 mm

Publisher's series area

Title proper of publisher's series

Operation update

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Custodial history

Scope and content

The item consists of a release print of an industrial film from 1981. In it, B.C. Hydro president J. Norman Olsen introduces a look at Hydro's strategies for meeting B.C.'s energy needs in the 1980s. The film considers the limited options for future hydro-electric development, low-water problems, load growth projections, and the promotion of energy conservation and more careful energy use during winter peak hours. Several forthcoming or proposed B.C. Hydro projects are discussed, including the Cheekye-Dunsmuir submarine power cable; the Site C development on the Peace River; the Hat Creek coal project; proposals for hydro-electric developments on the Stikine, Iskut and Liard Rivers; high-voltage transmission experiments, inert-gas switching systems, and other R&D projects; the Meager Creek geothermal project; and studies for a natural gas pipeline to Vancouver Island. Also discussed: Hydro rail operations; financing of Hydro projects; Hydro's growing demand for skilled personnel in specific fields and trades. The discussion of specific projects is illustrated with footage of the project or its physical setting, and there is especially good footage of the Stikine, Iskut and Liard River areas.

Notes area

Physical condition

Immediate source of acquisition

Arrangement

Language of material

Script of material

Location of originals

Availability of other formats

Restrictions on access

Terms governing use, reproduction, and publication

Copyright British Columbia Hydro and Power Authority.

Finding aids

Associated materials

Related materials

Accruals

General note

Accession number(s): F1992:05

General note

Previously described as AAAA2505

Credits note

sponsored/presented by: British Columbia Hydro and Power Authority; producing agency/company: British Columbia Hydro and Power Authority

Alternative identifier(s)

Standard number area

Standard number

Access points

Name access points

Genre access points

Control area

Description record identifier

Accession area